In 1989, the new Chief Executive of TSB Group's retail bank, Peter Ellwood, launched a massive reorganisation of the bank's operations that resulted in the Bank's operating profit more than doubling over a period of two years. The cornerstone of this effort was the "branch network redesign" project, a "process reengineering" effort conducted before the term BPR became fashionable.